Three ways to structure a regional network build

Density, terrain and demand patterns differ from one municipality to the next, so we never hand over a single fixed design. What we do is compare configurations side by side, with the same assumptions and the same level of detail, so your planning team can pick what fits the territory and the approval calendar.

Regional fiber ring

For corridors linking several cabeceras along a shared trunk. We model active strands against five-year demand, mark which segments can wait, and flag where empty duct banks are worth the extra trench now.

  • Capacity model and redundancy level
  • Trenching and duct specifications
  • Phased schedule with verifiable milestones

Edge data center placement

For teams that need compute and caching closer to the last mile. Site screening comes first: substation headroom, backup power, vehicle access for cabinets, and distance to the fiber backbone. In small municipalities the bottleneck is usually the substation, not the land.

  • Site matrix with coordinates and tenure status
  • Power and cooling assumptions
  • Civil works and permitting outline

Node distribution plan

For cooperatives and local operators spreading access points across dispersed settlements. We work from current subscribers and peak traffic per segment to decide how many nodes are needed, where they sit, and which ones can be deferred to a later phase.

  • Demand mapping by settlement
  • Equipment specifications per node type
  • Technical dossier for council review

Each option is delivered as a comparison, not a recommendation. You get assumptions, risks and next steps you can take to your committee.

Clarifications and working definitions

A few terms get used loosely when teams compare fiber rings, edge placements and node distribution. Below is how we apply them in our assessments, so a technical comparison stays readable and no one signs off on a misunderstanding.

What an option means here

An option is a configuration we can model and compare: a regional fiber ring, an edge data center placement, or a node distribution across service areas. It is not a product, a brand, or a commitment to build. Each one is described with its own assumptions about density, terrain and demand.

Capacity figures are estimates

Numbers from capacity modeling rest on subscriber counts, five-year projections and peak traffic per segment. They are planning estimates, not guarantees. When a projection changes, the model is rerun and the affected phase is flagged rather than quietly adjusted.

Civil works and permitting

We outline what permits, easements and trenching a configuration likely requires. We do not issue permits, and we do not represent a municipality or a cooperative before its own council. The dossier we prepare is meant to be submitted by your team, with your signatures.

No single recommended technology

We do not sell equipment and we do not push one vendor or one architecture as universally best. A dense urban core and a scattered rural cooperative rarely point to the same answer. The comparison is built so your planning team can choose what fits its timeline and operating capacity.

Phasing and continuity

A phased schedule is a sequence of verifiable milestones, not a fixed calendar. Each phase carries criteria for continuing, pausing or reworking the next one. Ducts left empty for later expansion are noted explicitly, so future teams know what was intentional.

Scope of our role

We advise and structure. Field surveys, node sizing, equipment specifications and technical dossiers sit with us. Construction contracts, equipment purchase and network operations remain with your organization or your chosen contractors. Where the boundary is unclear, we say so in writing.

What planning teams say after comparing fiber, edge, and node options with us

Most of these projects started with a single question: which configuration actually fits our terrain, our demand curve, and our approval calendar. The answers below come from municipal IT leads, cooperative engineers, and operators who went through the comparison process before committing to a phased build.

4.8 / 5

Average rating across 27 completed technical evaluations

31

Municipal and cooperative dossiers prepared for committee review

9

Regional operators using our capacity models for ring sizing

InfraFund Co options

"We had two candidate sites for an edge node and no clear way to compare them. The capacity model and the field notes gave our committee the same base to argue from. The dossier survived three rounds of questions without a single return."

"They did not push a vendor or a single technology. We compared a redundant ring against a phased node rollout, saw the civil works implications of each, and chose the sequence our cooperative could actually operate."

Technical coordinator, regional fiber cooperative

Teams we have worked alongside

  • Cabecera Norte Municipal Works
  • Cooperativa Red Valle
  • AndesLink Operators
  • Consejo Técnico Metropolitano
  • Rural Connect Cooperative